About usInfo for constructorsInfo for dealersInquiriesContactsSitemap
Sarmat RussiaSarmat RussiaSarmat Russia  |  Sarmat RussiaRussian Version
Sarmat Home > Dry construction mixes > Reference Information
Sarmat Home
“Termoshuba”™ system
Heat-insulating materials
Dry construction mixes
Heat insulation of pipelines
Development
“Thermodah’’ system
Quickly-erected buildings
News Archive

“Sarmat” dry mixes pass quality control test at all stages of manufacturing, beginning with the initial control of each component and ending with the quality control of every batch.

Storage:
“Sarmat” dry construction mixes shall be stored in tightly-packed, safe sacks in dry room conditions. Storage period is not more than 6 months from the date of manufacturing (see the packing).

Contact us:  

86/2 Kazintsa Str.
220108 Minsk
 

Tel.: (+375 17) 212-00-56
212-01-25
212-01-15
 

e-mail: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
 

Reference Information Print E-mail

The process chart for floor installation using “Sarmat” dry mixes (“NIVELANT”, “ROVLANT”)
The process chart for indoor and outdoor wall facing using “Sarmat” dry mixes (“MAXIMAL”, “OPTIMAL’’, “ELASTIVE’’, “FORMAT’’, “RENOVAT”)
The process chart for using “Sarmat’’ dry mixes for filling works (“FORMAT’’, “RENOVAT”, “ELITE’’, “SARMALIT NM”)


The process chart for using “Sarmat’’ dry mixes when performing indoor and outdoor finishing works (“GRAND”, “DECOR”, “EXTRA”)


The process chart for blockwork with aerated concrete using “Sarmat’’ dry mixes (“CONSTRUCTIVE”)


Fill in the form and e-mail it to This e-mail address is being protected from spam bots, you need JavaScript enabled to view it or send it by fax (+375 17) 200-12-77 and get the Reference Information Disk for free!

 
 
“Sarmat” construction holding company with limited liabilities
86/2, Kazintsa Str., Office 115, 220108 Minsk
tel/fax (+375 17) 212-73-44, 212-00-56, 278-52-02; secretar@sarmat.by
 
spacer