In 2004 “SarmatTermoEngineering” construction company (subsidiary of “Sarmat” holding company) got a certificate which certifies that quality management system meets the ISO Standard 9001:2000 requirements in the field of manufacturing, assemblage and designing of PI -pipes and shaped objects.

“SarmatTermoEngineering” services:

Designing of heat pipelines


Delivery of pipes, shaped elements, components as per project


Insulation of welded joints and delivery of materials for these purposes


Delivery and assemblage of warning systems


Insulation of pipelines (basalt fiber materials)

Pre-insulated pipelines and shaped objects produced by “SarmatTermoEngineering” construction company (subsidiary of “Sarmat” holding company) got the “Best Heat Insulation of Pipelines” diploma at the contest “Best Building Product”.

Contact us:  

11à, Domashevsky Lane, Room 810 (secretary), Room 901 (Sales Department), Room 910 (RRCS Department)
Minsk
 

Telephones: :
(+375 17) 286-21-07 -
secretary
(+375 17) 213-69-33 (44)
Sales Department:
(+375 29) 673-84-29 (23)
RRCS Department:
(+375 17) 213-68-56
 

e-mail: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
 

SROM – Warning system Print E-mail

Impulse type system for remote operation monitoring (SROM) is used for systematic control of insulation condition and timely detection of insulation sections with increased percentage of moisture in pre-insulated underground pipelines during their operating time.


ÑÎÄÊ. Ñèñòåìà îïåðàòèâíîãî äèñòàíöèîííîãî êîíòðîëÿ
Benefits of impulse type SROM:


Allows precisely detecting accident sites with different kinds of damage (wire break, short circuit failure, leakage and so on)
Allows detecting several accident sites simultaneously, estimate damage type and rate
Possibility of documenting, comparing and monitoring insulation condition
Possibility of PC use
High anti-interference ability


SROM elements:


Monitoring system wires
Elements for wiring work
Connecting cables
End and intermediate pipeline elements with hermetic cable output
End pipeline elements with loopback of signal wire under metal insulation plug
Switching terminals
Cover boxes
Moisture detectors
Moisture locator
Control instruments and mounters

Basic requirements to the SROM elements:
Distance from copper wire to steel pipe .......................................................................................................... 15 mm
Insulation resistance of one pipe or shaped element between signal wire and steel pipe (20 meters of wires and less)
should be not less than .............................................................................................................................. 10 MOms
Insulation resistance of 300 m of pipes (600 m of wires) should be not less than ............................................... 1 MOm
if pipeline length increases, the resistance reduces inversely.
To control insulation resistance of assembled pipeline and separate shaped elements you should use voltage ......... 500 V
without connecting to measuring circuit of measuring terminals with low-frequency plug-bridges
Voltage for controlling heat network moisture content when measuring terminals are plugged in should be controlled
by voltage which does not exceed .................................................................................................................... 220 V
Resistivity of copper wire ....................................................................................................... R = 0,012-0,015 Om/m
Acceptable resistance of assembled wires of ROM system…………not less than 200 Om for 5 km. of pipeline
Excess of acceptable value shows that wires have been improperly connected.


Installation of warning system

Ìîíòàæ ñèñòåìû àâàðèéíîé ñèãíàëèçàöèè
“SarmatTermoEngineering” construction company (subsidiary of “Sarmat” holding company):


Delivery and installation of SROM materials
Diagnostics of pipeline insulation condition, documenting and data analysis
Detection of damage location
Help in SROM designing, installing and maintenance

To install signal system at the joints you should use special crimping sleeves which provide splicing of signal wires.

SROM wiring work is made after steel pipe welding. While welding steel pipe polyurethane foam insulation ends should be protected with aluminum shield to prevent damage of signal wires and insulation layer.



Material consumption rate for SROM installment at one joint:
Material: Unit of
measure:
Quantity of materials depending on the nominal size of PI-pipe end
Crimping sleeve item 2,2
Wire holder item 4,0
Adhesive type
(L=50 m)
item 0,005 0,006 0,008 0,011 0,014 0,017 0,020 0,021 0,025 0,030 0,041 0,051 0,061 0,071 0,080
m* 0,24 0,30 0,38 0,54 0,72 0,84 1,02 1,07 1,25 1,50 2,06 2,57 3,06 3,55 4,01
Solder (250g) item 0,01
Soldering paste (250g) item 0,01
Changeable
gas bottle (600 ml)
item 0,01


Application of warning systems is regulated by the following documents:


STB (National Standard of the Republic of Belarus) 1295-2001 “Steel pipes pre-insulated with polyurethane foam”
Regulations for installment and safe operation of steam and hot water pipelines ratified by Ministry of Emergency and Ministry of Labor of the Republic of Belarus (30.11.1998).


All practical questions of designing PI - pipeline systems are covered in “Sarmat” Ltd. publications:



“Recommendations for PI -pipeline designing”


“Catalogue of pre-insulated pipes manufactured by “SarmatTermoEngineering”


“Manual for system assemblage of pre-insulated with foam polyurethane pipelines of nominal size 25/90-630/800”


“Manual for designing, assemblage and operating of ROM system”


You can ask a question to get additional information about application of “SarmatTermoEngineering” pre-insulated pipeline systems.

 
 